• Home
  • Introduction
    • Industrial Park
    • Shareholders
    • Establishment License
    • Business Scopes
    • Convenient Location
    • Project Scale
    • Maps
    • Prices and Fees
  • Infrastructure
    • Internal Transport
    • Electricity, Water, Post and Telecommunication Systems
    • Wastewater Treatment System
    • Other Support Intrastructure System
  • Processes – Procedures
    • Investment Processes
    • Rules on managing industrial park
    • Construction Management
    • Regulations to Contractors
    • Environmental Regulations
    • Entry Procedures
    • Regulations On Wage – Employee Benefit
  • Customer Information
  • Legal Documents
  • Contacts
  • 中文
  • Tiếng Việt
  • English
 
Processes – Procedures
  • Investment Processes
  • Rules on managing industrial park
  • Construction Management
  • Regulations to Contractors
  • Environmental Regulations
  • Entry Procedures
  • Regulations On Wage – Employee Benefit
Workshop Construction Processes in Da Deng Industrial Park

Date: 01/03/2010

APPLICATION PROCEDURE FOR CONSTRUCTION
  • First payment ( down payment as guarantee): 20% To be paid within 10 days after the signing of MOU.
  • Second payment: 30% to be paid within 60 days after the signing of MOU.
  • Third payment: 25% to be paid within 120 days after signing of MOU.
  • Fourth payment: 25% to be paid within 180 days after the signing of MOU.
  • When the lessee ask the lesser for the assistance to apply the investment license, the lessee must pay the fee of USD1,500.
  • Only after the payment of 75% of the total sum, the lessee can start the construction of the building.
APPLICATION REQUIREMENT FOR INVESTMENT LICENSE
Provided by Lessee
  • The copy of the passport of each shareholder.
  • Minutes of the shareholders meeting of each shareholder company.
  • Business license of each shareholder company in the foreign country.
  • The minutes of the Board Meeting.
  • Authorized letter for representative.
  • The copy of the passport of the representative.
  • Certificate of the balance of the bank account of the corporate or individual shareholder.
  • 2 years business records/ Financial report of each shareholder company.
  • Main products and market (for the products produced in Da Deng Industrial park).
  • Production procedure ( for the products produced in Da Deng Industrial park).
  • Machineries lists ( Invested in Da Deng Industrial park).
  • Raw material requirement / year ( for the production in Da Deng Industrial park).
Da Deng provide assistance
  • Application for investment license
  • Investment Plan
  • Rule and regulation of company
  • MOU to reserve the land
  • Land location map
  • Da Deng industrial park general map
Seal registration
  • Investment certificate (notarized copy)
  • Authorization
  • Passport/ID card (copy)
Tax code registration
  • Investment certificate (notarized copy)
  • Application for tax code registration
Bank account opening
  • Investment certificate (notarized copy)
  • Seal certificate (notarized copy)
  • Certificate of tax code (notarized copy)
  • Seal
  • Application for company establishment
Verification on land releasing contract
+ Verification by Management Board of Binh Duong Industrial Parks
  • Application for verification
  • Land releasing contract
  • The master plan of Da Deng Industrial Park
  • Location of released land
  • Land use right transfer certificate (red document) of the land intended on right transfer (notarized copy)
Application for granting land use right transfer certificate (red document)
  • Application for land use right transfer
  • Investment certificate (notarized copy)
  • Land releasing contract
  • Land use right transfer certificate (red document) of the land intended on right transfer (notarized copy), attached with the original for comparison.
  • Boundary map of released land
  • Certificate of undertaking environment protection (or environment impact evaluation report (notarized))
Construction permission
  • Application for construction permit
  • Investment certificate (notarized copy)
  • Land use right transfer certificate of the transferred land (notarized copy)
  • Boundary map of released land 1/500
  • Certificate of undertaking environment protection (or environment impact evaluation report (notarized))
  • Professional certificates of engineering engineers, architects, companies
  • Professional certificates of electricity, water engineers
Construction completion permit
  • Investment certificate (notarized copy)
  • Land use right transfer certificate of the transferred land (notarized copy)
  • Construction project inspection results (notarized copy)
  • Construction permit (notarized copy)
  • Fire prevention and fighting agreement (notarized copy)
  • Fire prevention and fighting check-over minutes (notarized copy)
  • Certificate of undertaking environment protection (or environment impact evaluation report (notarized))
  • Minutes of construction project check-over (original)
  • Construction, engineering and geology survey contracts (notarized copy)
  • The owner shall prepare a statement by themselves in case of having no construction supervisor.
CopyrightEN
DA DENG CONSTRUCTION & INVESTMENT CO., LTD.
Plot F1-CN, Da Deng the Industrial Park, Phu Tan Ward,
Thu Dau Mot Town, Binh Duong Province
Tel :(84)6503898955 Fax :(84)6503828452 **Email:daden8989@yahoo.com.tw
HOTLINE     0650 389 89 55
© 2009 DA DENG CONSTRUCTION & INVESTMENT CO., LTD.
Design by Apecton

.